Site Lanud Sulaeman Bandung (Koneksi PLN)

Up-date tgl. 08 Juni 2011

Foto Koneksi Power PLN dan KWH meter

Up-date tgl ; 19 Mei 2011

  1. Aplikasi PLN telah kami terima dan registrasi on-line.
  2. Pembayaran BP telah dilakukan per hari ini, Kamis 19 Mei 2011.
  3. Estimasi koneksi 2-3 hari.